I'm trying to create a tool type resource and define it as a resource pool needed for the execution of some tasks. I'm able to generate the resource and insert a product to graphically represent it. I can assign it to activities and everything works as expected until I start the simulation. When I do, I'm promptly shown a message that says "Resource creation failure". After that, it doesn't look like the simulation actually checks if the resource is available or not.

Did anyone ever met any issues like this?