How to Model Line Drain Before SPM and Gantry Setup?

Hi Community,

I have a production line:

A → B → C → D → E → F → G

A gantry handles parts from B through G, and Station E is an SPM.

During a model change:

  • The SPM requires setup/changeover.
  • The gantry also requires adjustment/setup.
  • Before the setup starts, the line section from B to G must be completely drained.
  • After the line is empty, setup should be completed on both the SPM and gantry before releasing the next model.

The required logic is:

Stop input at B → Drain B-G → SPM & Gantry Setup → Start next model

How can this logic be modeled in DELMIA Factory Flow Simulation?

Also, is it possible to assign a setup/changeover activity directly to a gantry resource? I currently see setup options for machining/NC resources but not for the gantry.

Any suggestions or examples would be appreciated.