Hello All,
I have queries related to Manufactured product for configured BOP.
We have 150% BOP structure which is for 2 variants, basically structure contains,
General System
-> General system
---->General Opr1 (variant 1)
---->General Opr2 (variant 2)
---->General Opr3 (variant 1 OR variant 2)
Now when we apply filter for variant 1 then General Opr 1 & 3 are valid when we create Mfg product for the station using Synchronize data with planning command then it generate Mfg product with parts assigned to General Opr 1 & 3 which is correct.
Now when I apply filter for variant 2 then General Opr 2 & 3 are valid when we create Mfg product for the station then it doesn't allow to create new Mfg product, instead updates existing one but to work for simulation for variant 1 or variant 2 we need specific Mfg product which I am struggling to create.
Queries -
- How to handle configured BOP and Simulation together?
- How to create multiple Mfg product specific to variant on same General system object?
- What are best practices to manage simulation for configured PPR?
Any lead will be really helpful?
