How to manage Robotics simulation for 150% BOP?

Hello All,

 

I have queries related to Manufactured product for configured BOP.

We have 150% BOP structure which is for 2 variants, basically structure contains, 

General System 

      -> General system

              ---->General Opr1 (variant 1)

              ---->General Opr2 (variant 2)

              ---->General Opr3 (variant 1 OR variant 2)

Now when we apply filter for variant 1 then General Opr 1 & 3 are valid when we create Mfg product for the station using Synchronize data with planning command then it generate Mfg product with parts assigned to General Opr 1 & 3 which is correct.

Now when I apply filter for variant 2 then General Opr 2 & 3 are valid when we create Mfg product for the station then it doesn't allow to create new Mfg product, instead updates existing one but to work for simulation for variant 1 or variant 2 we need specific Mfg product which I am struggling to create.

 

Queries - 

  1. How to handle configured BOP and Simulation together?
  2. How to create multiple Mfg product specific to variant on same General system object?
  3. What are best practices to manage simulation for configured PPR?

Any lead will be really helpful?