Hello community,
I have a big interrogation on how to model the previous scenario.
- conveyor where Kit boxes (carrying parts) are unloaded by an AGV train (done)
- On next conveyor of the Main Line : I want to condition Kit Box and empty pallet as explained in the picture
For the Kit Box preparation (not appearing here), I have modelled a Station where a Worker performs Pack Activity on the mobile storage for each part.
Then this Kit Box is brought to the Main Line by an AGV train (this is working well)
I'm stuck in the next of the process :
I'm able to assign a specific product per DZ (here 2 different pallets)
As written in the picture my goal is to condition and synch motion of both.
For the next activities (Station 2 & 3 for instance) I assume I would have to do an Unpack Activity on position (a) and a Pack Activity on position (b) but still not sure as somehow both DZ must "work together"
Any idea on how to do it ? @GD @SR @NP or somebody else
Thanks
