Hello! I am trying to set up a factory flow with multiple products and multiple machines that are interchangable, all machines can manufacture all products. The daily output number for each product is defined in an excel sheet. The number of operators needed for the manufacturing processes also differs, so the goal is to have the machines working parallel with all operators active.
My question is if there is an option to have this excel data control the simulation - effectively having the operators change activities once a product reaches the output numbers.