Hi Community,
I am trying to model the following scenario in DELMIA:
A → B → C → D1 → D2 → D3 → E
D1, D2, and D3 perform the same operation, but each part should visit only one of them.
The intended logic is:
- Part leaves C.
- Select D1, D2, or D3 based on availability/routing criteria.
- Process the part at the selected D station.
- After processing, bypass D stations located downstream and route the part directly to E.
For example, if the part is processed at D1, the part should pass D2 and D3 without stopping or being processed again.
What is the recommended way to achieve this in DELMIA Factory Flow Simulation / 3DEXPERIENCE? Can this be handled through routing rules, product attributes, or another logic?

@HA I hope station D1, D2 and D3 are parallel where the first part would go to station D3 the second to D2 and third to D1. In this case you can use conveyor route group. share a sample video on this,