EKL — Create operation-step resource usage with StepOnly mode in 3DEXPERIENCE 2025

Hello,

I am developing an EKL script to import a manufacturing workplan into 3DEXPERIENCE 2025.

Our intended structure uses:

  • One shared primary resource instance for the entire workplan.
  • One instance per distinct tool in the workplan’s resource positioning AREA.
  • Reuse of the same tool instance by several operation steps, including steps belonging to different Header Operations.

I am using the DS example based on CreatePrimaryCapableResourceLink, CreateSecondaryCapableResourceLink and SetRscUsageOnCapableRscLink as a starting point.

I need to create resource usage details for individual operation-step occurrences, whose reference type is DELLmiGeneralOperationReference, and set their usage mode to StepOnly.

CAA implementation uses DELIPPRRscPositioningMngt:

CreateCapableRscDetail(secondaryLink, stepOccurrence, resourceDetail);
SetAvailabilityMode(resourceDetail, AvailabilityModeCAA::StepOnlyCAA);

I found GetRscLinkDetailsFromCapableRsc for reading existing usage details, but I need to create them and set their availability mode.

The DS tutorial “Import System Structure From Excel with Capable Resources”, validated on 2026x GA, states that setting child-operation resource usage modes is not available through EKL and requires manual UI interaction.

Could you please clarify:

  1. Does this limitation apply to all 2025x levels? Is there a supported EKL function or alternative for these two CAA calls?
  2. Can the primary and secondary resource links be attached at workplan level and used by steps under different Header Operations? If not, what supported link structure would preserve one tool instance per workplan?
  3. Could you provide the function signatures, expected argument types, and a short example reusing an existing tool instance?

     

Thank you for your help.

Answers 1
KK
KK 2026-10-19

Hello @AV, 

Q. 1&3: Unfortunately we have not identified EKL API or public web service for this, hence comment on “Import System Structure From Excel with Capable Resources”. You may need to raise ER to ask for API availability.

As you pointed out, this evaluation was done on R2026xGA, surely limitation with API availability would apply also to earlier releases including R2025. 

However since you have identified CAA APIs, you may be interested to explore this document: https://www.3ds.com/support/documentation/resource-library/interoperability-between-ekl-and-caa-3dexperience-native-apps-customizationWhich provides guideline for calling CAA from EKL in chapter 4.

Q. 2: In principle you could create primary capable resource link (secondary is not possible) between workplan and resource. It would create only data link resource would not be available in 3D buildup. It would not allow you to establish step usage on child step level. Also this would not work in downstream continuity with Apriso and planning. 

In the manage capable resource window, you have an option to copy assigned resource from one Header Operation to another. 

 

Since you are creating capable resources link programmatically, you can use EKL to establish relation Header Operation - Resource with capable resources link for multiple Operations.

Just to make sure we are describing the same: there are 2 functionalities in Capable Resource data model which could be referred as Resource Usage.

 

The one in purple can be set with EKL with SetRscUsageOnCapableRscLink and so this way you can establish the same resource is used in every operation in process, during import with EKL.

Manage Operation Step (Step Usage / V_Availability mode) is the one mentioned as limitation.

If you find solution, please share, so that others can also take advantage. Thank you!

 

 

 