Hello all!
How colud we approve the PPR Sturcture?
We need to approve:
1. MBOM structure
2. Process with operations
3. Resources structure.
4. WKS (Work Instructuin)
Now we do this though CA (Change Aciton). And if we want to reject CA and do some notes for discribing problems, we use Power Point (ppt). And attache this ppt to CA and reject.
Do we have any instruments for review, like "Desigh Review" for CAD structure?
0
