Does SOLIDWORKS tend to “blow up” from small changes? Do you do project work where no two designs are the same? Or does SOLIDWORKS feel super slow opening your assemblies? You feel there has to be a better way? When I get called in to consult on SOLIDWORKS problems at customers, 90% of the time I can put three envelopes on the table before we start any discussion, and by the end of the conversation, the answer to the problem is in one (or all three) of the envelopes.
3DXW22
BrandonNelms
InstructionalCourse
DesignEngineeringMechanical