[GEOVIA] Underground Mine Designer

Functional Value

1. Save significant amounts of design time and reduce CAPEX costs through the ability to create a targeted Decline design between 2 points.

I

I
Shortest path design process to reduce the length and the cost of the mine development associated with the decline