Functional Value
1. Ensure that waste stockpiles meet the needs of the Mine through the ability to link a total Volume to the Design process.
2. Vary ramp parameters by location, enabling different ramp generation depending on localized constraints
3. Improve the practicability of the ramp design by considering flat areas.
4. Enable the mine designer to create the haulage network to run scenario analysis.
