Functional Value
- Save time during the ramp creation process, while also achieving improved ramp designs and an overall reduction in ramp lengths. This is enabled by providing more flexibility for Mine Planners when dealing with flat zone in the Pit designs.
- Create safe and practical designs by honoring ramp width when providing berm access at both toe and crest locations.
- Enhanced design capabilities enabling support of multiple pit bottoms or zones.