Functional Value
1. Improved project value and performance are offered through the new NPV Scheduling Optimization Engine, which enables demonstrated reduction in runtime and gap to the theoretical achievable NPV using industry benchmarked tests.
2. Generate more realistic NPV through enhanced scheduling capabilities utilizing physical constraints such as Pit and Phases from a block model attribute or surfaces designed using GEOVIA’s Surface Mine designer Role
3. More realistic NPV generation is provided by enhanced scheduling capabilities that support the definition of bench constraints as sinking rate (vertical advance).