[DELMIA] Equipment & Layout Engineer

Functional Value

Reduce the time needed by Equipment Engineers to validate and optimize a production line with improved performance of conveyor simulations.

I
Reduce the time needed by Equipment Engineers to validate and optimize a production line with improved performance of conveyor simulations

I
It is possible to build easily a complex conveyor system and simulate it with a huge number of parts