Seems that for years everyone I know has been doing the same thing. MS project or something similar or filling in cells in an Excel spreadsheet. We have simulation software that essentially does a timing chart, but everything I've seen requires a model of some sort. 

What is out there that can be used for timing charts prior to the existence of a model. In the perfect world this would be the "bones" of your system. It would be developed and used during the quoting phase. Motors, Axis, loads etc would be defined and it would spit out a pretty timing chart that can be used for sale/quotes and transferred to engineering if the projected is awarded to you. 

I see a lot of stuff like this out there for electrical timing but I'm leery as to how well that would translate to mechanical purposes. I also seriously doubt any of the electrical packages have a place to drop in loads, motors and drive axis information.

Does SW have anything for this? Any thoughts on other packages? SW has everything you would need to make this happen expect possible the report function and the downfall is that it requires a model.

Any ideas or thoughts would be appreciated.

Thank you

SolidworksSimulation
Answers 11
JM
JM 2021-04-08 Best Answer

Our company developed our own proprietary software that is very specific to us for our motors. I don't know of anything that is out there. Sorry I cant help you with this one.

MJ
MJ 2021-04-08

Thanks. I like the way this uses conditional formatting better than the way I did it. I used a stacked bar chart and it needed a whole lot more input to accomplish than this. I know I could brute force my way into something that would work but I think I might take the time and try to come up with something that is more user friendly and elegant.

Not real world or complete, as I was just looking at formatting options, but mine looked like below.

comment imagecomment image
JM
JM 2021-04-08

For a second, I thought maybe you could do something inside of the Motion manager, but I don't think you can export anything and It might take more time to do than a spreadsheet.

JB
JB 2021-04-08

I know what you mean... And I know what you're after.  And I know this ain't it.  It's shy a lot of detail.  But it has been helpful to me as a rough tool.  It's sequence-based rather than actuator-based, but it can help you lay out a process and get a reasonable estimate of cycle time.

At my last job, I looked, my boss looked, my coworkers looked for some kind of way to do an actuator-based chart in some sort of usable fashion.  No dice.

The gantt looking part of the chart fills out automatically using conditional formatting.  It's simply based on the values in the "Start Time" and "End Time" columns.  It doesn't really matter how the number gets in that column, you can leave the formulas in there, or just type a number, or link it to any other cell.

MJ
MJ 2021-04-08

Jason Martin wrote:

I am pretty sure that there is some kind of software out there that will help you with this.

That's why I'm here. I can't find anything and was wondering if others knew of something.

Jason Martin wrote:

For those people that have been in the field for "Decades" well, some things will just never change with them as they age. they get comfortable with what they have. While some of us here are always looking for the "Best Way" of doing a task, the others only focus on what they have in front of them and nothing else. There are many resources out there that will improve efficiency.

I think this is less a case of "don't want to learn anything knew" as much as "The return is not that great". Typically doing a timing chart is not that big of a deal for a typical station or system. Filling Excel Squares and "Estimating" cycle becomes a small fraction of the entire design process. However in my case I'm doing a lot of concepting and quoting and less design. So where as the designer might do a single timing chart and then a couple hundred hours of other work. I'm doing a timing chart and maybe 20 or 30 hours of other work.

I'm also doing a whole lot of "What if's" where I might have half a dozen timing charts for a single project/Quote where as a designer might only do one. I then have to wrap that up into a nice easily readable package where I can say "see if you purchase this option you will get these many parts..."

Thanks for your input.

JM
JM 2021-04-08

I am pretty sure that there is some kind of software out there that will help you with this. I have never personally searched for one because well... I don't need to!

For those people that have been in the field for "Decades" well, some things will just never change with them as they age. they get comfortable with what they have. While some of us here are always looking for the "Best Way" of doing a task, the others only focus on what they have in front of them and nothing else. There are many resources out there that will improve efficiency.

There was a Reddit thread I read recently on crazy things that bosses have made their employees do the hard way instead of the most efficient way. to give an example, one boss didn't trust excel formulas and made employees do calculations by hand. that's the baby boomer generation for ya.

MJ
MJ 2021-04-08

Jason Martin wrote:

but in considering that this is a more unique and custom program that you are wanting,

I guess that's the part I don't get. The function is not unique. Every company I have ever worked at or with that does automation does timing charts. I asked three Engineers here that have been in the field for multiple decades and worked at many different companies. They all said similar things and none had ever used an "Automated" timing chart like this.

I guess that's why I'm finding it hard to believe something like this isn't out there. 

The fact is that there are LOTS of programs out there that will do this IF YOU HAVE A MODEL. But I can't find one that you can just enter in data and get a pretty chart. The data that would be entered would be the same that is pulled from the model, torque from motors, loads, ACCDEC etc. Seems like doing it with a model is more difficult than doing it without one.

JM
JM 2021-04-08

I completely understand that time is valuable, but in considering that this is a more unique and custom program that you are wanting, sometimes its best to do it yourself. Then later on, if you wanted to add to it, you could make it better since you know how you developed it.

Good luck with that!

MJ
MJ 2021-04-08

Jason Martin wrote:

Well, it certainly seems like you have all the information you need already. You just need to find a better way to organize it right?

If your company has an IT department, I'm sure they could put something together to make it work. Or, you could just make a really fancy Excel Sheet. I've seen some engineers here make they really presentable Excel sheets.

Again, that's what I had in mind. I'm not entirely convinced that Excel will give me the "Best" presentation of the results but I've used it to create a reasonable facsimile of what we are looking for. 

Developing the spreadsheet, including macro's etc will take a bit of work but it is certainly doable. I just didn't want to put that work in if there was a professional product out there that does what I need it to do.

Thanks,

JM
JM 2021-04-08

Well, it certainly seems like you have all the information you need already. You just need to find a better way to organize it right?

If your company has an IT department, I'm sure they could put something together to make it work. Or, you could just make a really fancy Excel Sheet. I've seen some engineers here make they really presentable Excel sheets.

MJ
MJ 2021-04-08

Jason Martin wrote:

Our company developed our own proprietary software that is very specific to us for our motors. I don't know of anything that is out there. Sorry I cant help you with this one.