We have been using SolidWorks and EPDM for almost a year now and up to this point have not had an issue with updating assemblies and drawings when a child part is updated. We just checked them out and did an update/save and then checked them in to show the updated children. Now we are running into large numbers of assemblies/drawings that have to be updated due to a single revision on a part. Is there a way to update all of the "where used" files in EPDM? We are currently using SW/EPDM 2010. ThanksSolidworksSolidworks Pdm enterprise Pdm