In my company's last SWX meeting the discussion came up whether or not to open up older assemblies and spend the time fixing the mate errors that inevitably appear. Anybody out there decide not to fix older assemblies and what have you experienced?
SolidworksGeneral
I normally do not go looking for trouble. I will address issues at the next time a file is opened rather than opening it to see if there is a problem.
I agree with Jeff. If I needed one of the old assemblies I would fix it, otherwise I wouldn't bother. Unless I was just bored and didn't have anything else to do.
It depends on the level of control on your design. A proper ECO for a part under process control will include at least an inspection of all controlled assemblies using a changed component.
I so agree with Jeff. Why look for trouble? Fix it as changes arise and the need is there.
Unless your company is extremely slow and you are looking for work.
You're right Roland. If it was part of an ongoing project I would definitely fix it.
I recommend doing this on an as needed basis. If you happen to need one of the old assemblies, fix it at that time. The overall cost wont hit you all at once. Time would be better spent working on current jobs no doubt.