Has anyone else come across this issue?  I use Solidworks Task Scheduler on a daily basis to convert a large list of files to dxf's and pdfs and now with the new windows update it appear that it doesn't work anymore.  Has anyone found a work around or am I going to have to figure out a way to uninstall 8.1.

Chris

SolidworksTask Scheduler
Answers 14
SF
SF 2013-10-23 Best Answer

I guess I should have mentioned that I'm currently using SW 2013 SP4.0.

AW
AW 2013-10-29

I also upgraded to Windows 8.1. I found that task scheduler stopped working in SW 2013 SP4 and also SW 2014 SP0.

AW
AW 2013-12-03

Updated to SW 2014 SP1 and the task scheduler opens each part now which it didnt do before but still nothing is sent to the printer.

SF
SF 2013-12-03

From what I can gather, the issue is with windows 8.1.  Windows 8.1 removes the abiltiy to do tast scheduling (windows tasks such as defragment).  This is the only thing that makes sense but I have not heard back from CATI if this is the reason.

LC
LC 2014-01-30

Has anyone found a solution to this issue? Waiting to hear back from our support but thought I'd ask and see.

Our problem system is running windows 8.1 pro and Solidworks 2014 SP1

Thanks!

SF
SF 2014-01-30

Larry,

No this really has not been resolved yet.  From the research that I have done, Windows 8.1 gets rid of windows task schedular which from also what I can gather what runs the task scheduler in solidoworks.  I have also found that this effect quite a few things dealing with PDM systems.  Best thing I can suggest (this is what I did), do a re-install of windows 8 and never update to 8.1 (you have to do a fresh install of windows 8 in order to revert back).

I talked with our local rep (CATI) and they still have not been able to fix it.  They actually emailed me a week or so ago and asked if I was still having this issue and I said no because I reverted back to windows 8.  Instead of keeping it as an issue they closed the case and said it was resolved when the issue is still there!

Sorry for rambling on, but I don't think there is a resolution for windows 8.1 and solidworks.

Chris

AW
AW 2014-01-30

I have some more information to pass on about this topic. I use Solidworks 2011 also because one group i work closely with has not upgraded beyond this version. I can use task scheduler to do a batch of prints with no problems in windows 8.1. Solidworks 2014 even after the sp1 it still does not work...

SF
SF 2014-01-30

Very interesting...  Why would 2011 work but starting 2013 sp1+ it does not?  Thanks for the info.

LC
LC 2014-01-30

That is very interesting, makes me think it's something that solidworks should be able to resolve. Our support reps our going to Solidworks with this so I will post more if I hear anything. Really don't feel like resetting up the entire pc.

LC
LC 2014-02-06

From our support (Hawkridge):

Solidworks was able to reproduce this issue when they used the Task scheduler on Windows 8.1 for the very first time. They found that the time out value for all of their tasks had been set to zero for some reason. Changing this value back to its default value of 3600 seconds resolved the issue and allowed them to run all Task scheduler tasks on the Windows 8.1 machine. Please check these timeout values and let me know if you see the same error that Solidworks found.

I haven't tried it yet so I will post back with results.

LC
LC 2014-02-06

I checked the setting in the task scheduler and it was already at 3600 seconds so this did not resolve our issue. We are back to the drawing board. Let me know if it works for anyone else.

AW
AW 2014-02-06

Mine was set at 0 seconds. I changed it to 3600 seconds and it worked!

LC
LC 2014-02-17

Maybe I was looking at the wrong setting. Can you tell me where exactly you made the change or include a screenshot?

Also a note are you using the task scheduler with EPDM or stand alone?

Thanks!

SF
SF 2014-04-23

Try updating Solidworks 2013 to service pack 5.0. This solution worked for my windows 8.1 laptop.