So I understand that the electrical PDM connector is a new tool and still has several kinks to work out. I have been struggling to get everything functioning as we would expect. I have had some success and some fails, I have been able to get SWE properties to map to PDM variables and PDM variables to map back to Solidworks electrical projects. But some issues I still have not been able to over come.
Issue 1: getting PDFs and DWG files to update upon approval of a project. I would assume it would be possible to set up a PDM Task to accomplish this, I have tried writing a script for this and attempted using the (PDM add in) dispatch, but when the task attempts to open the file, SWE tries to unarchive the environment and launch the project manager, basically causing the task to fail before the project even opens. The only work around I have found, is to manually open a project from solidworks electrical and check out an "approved" project with admin rights and then check the project back in. this allows me to get the approved stamp and approved date along with the current revision onto my PDF files and DWG file, (it allows electrical to generate these files with the DATA it has captured from PDM) so my question is has anyone else had this issue? Has anyone had success with an automated work around? Is there a plan to correct this in an upcoming service pack?
Issue 2: (WiFi) so this is similar to the issue above, it all has to do with transferring/syncing up data between SolidWorks Electrical and PDM. As I mentioned above I have successfully gotten data to sync up, but only when I am hard wired to our net work, if using a WiFI connection or working remotely with a VPN (step 8 of 11) "Exporting data from SWE" with fail nearly every time. Do other users have issues with Electrical when using WiFi? Does anyone have advice?
On a side note, if anyone has any questions or would like advice or examples of what I have gotten to work successfully with the Electrica PDM connector tool, feel free to ask, I would be more than happy to help.
SolidworksElectrical
Ragarding "Issue 2":
We have tried working with SWE over VPN to our server. Did not work at all.
So I bought one more computer, so that one of our engineers could work with SWE on remote desktop via VPN to the local computer. This works well. Probably possible to do with a virtual machine on the server too.
Seems like the database connection is really sensitive to slow network speeds and latency.
Dear Miles,
Now I just manage the electrical project in PDM with Connector Tool so I have 2 problems:
1. How to create the empty project follow the template that I made from PDM interface? So after that I can check out and do on it. But nơ I just can create the project in the SWE software and after that use the Connector Tool to check in on PDM.
2. When the project in PDM, only one user check out it and do on it; but I want many users do on the project on the same time, because if the project not in PDM many users can do on it on the same time. So I want some users can do on the project on the same time. How to?
Can you answer me, please? Thanks you so much
Thanks for your input, yes network speed can drastically effect the performance of the tool, whether it be VPN, WIFI or other factors. like you mentioned, our company is setting up a remote desktop as well for off site users, this appears to be the best solution for the issue.