I’m using SolidWorks 2009 SP5.1 on Windows XP 64bit and I’d like to schedule the animations created with Motion Sudies.
The tasks are scheduled and starts; the report tell that all was right and the job is done, but the files are not generated.
SolidworksTask Scheduler