hi guys!
I have a problem with costing template.
When I want to do a personalized template, I change all parameters with my dates, but when I try to change the depth cut, SW don't change the costs.
One example of my test, with dates highly exaggerated:
Diameter tool(mm) | Advance (mm/r) | Cutting speed(m/min) | Depth cut (mm) | C Maerial | C Fabrication | C Total |
10 | - | - | - | 1,96 | 8,75 | 10,71 |
20 | 0,125 | 45,72 | 1,524 | 1,96 | 0,46 | 2,42 |
50 | - | - | - | 1,96 | 0,18 | 2,14 |
- | 0,05 | - | - | 1,96 | 1,15 | 3,11 |
20 | 0,125 | 45,72 | 1,524 | 1,96 | 0,46 | 2,42 |
- | 0,2 | - | - | 1,96 | 0,29 | 2,25 |
- | - | 30 | - | 1,96 | 0,7 | 2,66 |
20 | 0,125 | 45,72 | 1,524 | 1,96 | 0,46 | 2,42 |
- | - | 60 | - | 1,96 | 0,35 | 2,31 |
- | - | - | 0,5 | 1,96 | 0,46 | 2,42 |
20 | 0,125 | 45,72 | 1,524 | 1,96 | 0,46 | 2,42 |
- | - | - | 3 | 1,96 | 0,46 | 2,42 |
Thanks