Does anyone have a recommendation on how to handle modified purchased parts?
In the past I have always assembled the part into an assembly and made my modifications. Or is it better to used a linked part in a part file?
Thanks
Scott Schueler
SolidworksParts And Features
Can't you just add two configurations to the part file? How is it being handled in your document control? Make your SW files match your document control, if possible.
If you use a modified part drawing, then use Insert>Part. If you use the same drawing for both the incoming part and the modified part, or you don't use an incoming drawing, then just use two configurations in one part file.
From a SolidWorks perspective, I would recommend inserting the purchased part into a new part file. This gives a little more flexibility than inserting the part into an assembly. Most likely you would just be making cuts to the part, but if the need to add material arises, the assembly method will not work.
From a documentation perspective, the modified part should receive a new part number... i.e. when you buy it, it has one part number, after you modify it, it has a new part number.
The reason I was leaning to using an assembly was the ability to have a BOM. I thought the BOM would help show that you needed to buy the vender parts and make the modifications shown on the drawing to it.
I didn’t ever see a time I would ever need to add material to the vendor part. Do you know of an instance that you might need to?
We try to stay away from configurations on purchased parts because we tend to use a lot of the same parts with different modifications done to them. Configurations can get messing if the parts is used in a lot of different assemblies.
Thanks
Scott
not sure about the adding of material, but we use derived parts extensively, and the reference is there for "where used" and "referenced files" searches to find.
Jeremy
Good point about the BOM. You won't be able to automatically show the make from on the drawing if you use the part method vs. the assy method. You could however add a custom property to the part file that is the make from information. Then it could appear in your drawing automatically... maybe in the material field.
As far as a situation where you want to add material... The first things that come to mind welding on a lug, bonding on some other thing, encapsulating an electronic component... would all prefer to be assemblies too.
Maybe it depends on the complexity of your "cuts". Your assembly cuts are limited to extrudes and revolves. So if you want to do a cut sweep or loft, the assy won't work.
From a engineering view you should never alter any purchased parts, once you change a purchased part you own it! you loose all waranty on that part. If you have to alter it why not just make it yourself.
Another vote for the assembly method.
Using an assembly maintains the traceability back to the purchased part. Also, you will never suddenly add more plastic or sheet metal to a purchased part. Any additional material will be assembled into place (glued, bolted, welded....)
For the record, the official name for the drawing that shows how the purchased item is modified is called an "Altered Item Drawing". Check out your ASME Y14 documents.
Altered purchased parts is a last resort, it is good practice to not alter them. I don't know many suppliers that will back up thier product once it has been altered such as having something welded to it.
There are plenty of good reasons when using an altered item is acceptable and even preferred. The simplest example is if you need a screw of an exact, non-standard length. There is no way you are going to tool up a brand new screw when just cutting a bit off the end of a longer screw would work just fine.
It goes without saying that you can't send back an item to a supplier that has been altered.
That would work but it is not good practice, the better way would be to use the closest size screw and then machine the screw head bearing surface to the depth that you need or use a spcer to bring it back to bring the screw to it's desired depth. This is alittle more machining for manufacturing but if you ever need to replace the screw you can just pull one off the shelf and screw it back in, not go cut it gind the end so that it can screw into the threads. This takes time and hassle especially for a customer and thier maintenance crew
Sometimes it is just cheaper to alter a purchased part rather than making you own. We buy blank vacuum flanges that have all of the details to provide a vacuum seal. We alter them to attach to our vacuum tube components. Yeah, we could detail out all of the features to make the flange from scratch... but why re-invent the wheel.
I have the same question. Working with SW since 2004 (and Creo/ProE) and never found a good answer. Here is the deal. We, as and OEM, design parts that use purchased material blanks, as an example, gear stock in long lengths. (Or any workable stock) We have tried to have the gears machined custom without doing this, but always get a No-Quote in response. Some gears we can get 5 to 6 finished gears out of one blank. Others we can get up to 20 finished gears out of one blank. We have no current way to make the purchased gear stock a precursor (sub-component?) to the finished gear and have the purchased component roll up into the BOM in the correct quantity (i.e. 1/6th of the purchase, or 1/20th of the purchased unit). This would translate to any sheet metal or rod-stock component done on automated manufacturing processes. Purchased in whole sheets, bars or forms, how much of the purchased unit goes into the BOM? It isn't one whole purchased unit per finished good.
How does SolidWorks expect to be a complete manufacturing tool, if it cannot handle this. I have designed and worked on older systems that COULD do this.
Any suggestions?
SolidWorks isn't a EPR system, it's a Software used for Design. Did you try the Costing in SW??
I would say it depends on your usage of the purchased part in it's new configuration. Are the modifications you make unique one of a kind modifications, never to be used again. Or are they new renditions of the purchased part that you will begin to use in other assemblies in the future?
In the first case I'll tell you what I do. take it or leave it. I design injection molds and use a ton of purchased parts that get modified most of the time. The modifications are unique so I have a library of vendor parts/assemblies.(This is just to keep from always having to go to their website and get them) When I need one for a project I copy and paste it into the new project directory breaking all ties to the original. Make any modifications required and in the B.O.M. in the description field manually add "(Altered)" to the description. This gives a trigger to those using it that it needs to be modified. You should also make a drawing view or 2 to document the modifications required for manufacture. Note we do not have PDM so I don't know how this method would work with that, but I don't think it would/should be too much of an issue since you could add a prefix to the part name to identify it uniquely.
If you have the 2nd case. I would go the route of adding a configuration to the part and storing it in a central library for future use. I would also make a drawing with multiple sheets showing the different configurations. This could get large and unruly if you have many configurations, but you could always copy and paste the sheet you need at the time of drawing issue to the main drawing and abandon the rest. The B.O.M. works off the view it is derived from so it would have the right configuration and description if you set it up that way.
Your "gear" is not gear in inventory, its a bar stock.
You stock 3 ft, use 2 in for Part 1, 0.5 in for Part 2.
Here is how I do it:
In the material field of my custom properties for the part, I add the vendor and vendor part number. Then I insert the purchased part into my empty part file and give the new part file an internal detail number. Make my changes and create 2 configurations. One of the unmodified component and one of the modified component.
Depending on the complexity of the change, sometimes I will add both configurations to an assembly. Then use an "Alternate Position View" to overlay the 2 configurations on the drawing.
But if the change is simple, then I will just show a view of the modified version and another view of the unmodified version (labeled, of course).