LARGE ASSEMBLY DRAWINGS CONFIGURATIONS VS DISPLAY STATES

Hello,

   I have a large assembly with over 20 drawings.  My times per change is over 5min per.  I have 8 configurations and 7 display states.

Am I hurting my self with drawing region time with having both?  Is it better to have one type than two?

In the display states they are mainly details of the others.

example model of house with eight different drawings - walls, hvac, electrical, appliances, roofing, foundation, site, and piping

Thanks,

Joe

SolidworksDrawings And Detailing