I have dual dimensions selected with Metric as primary but would like English materials in my BOM because material being ordered is english.
SolidworksDrawings And Detailing
I have dual dimensions selected with Metric as primary but would like English materials in my BOM because material being ordered is english.
SolidworksDrawings And Detailing
The dual dim's are enough. It's extra unneeded effort to add the dim's in the BOM.
Are ERP system orders materials from BOM. And we have formulas in model to generate material needed.