Hello,
I get my Path from the PDM ->
Set myBlockDefinition = Part.SketchManager.MakeSketchBlockFromFile(Nothing, "Path to the .SLDBLK", False, 1, 0)
and then I want to insert the Block (with mouseclick only) into the drawing ->
swModelDocExt.RunCommand swCommands_InsertBlock, "insert"
The Problem is:
if I insert different Blocks (for example: A1, B2, C3) and i want to add another Block (e.g.: D4) with the Macro, the preview in the Blocktable still displays A1.
How can i change this order to newest first?
Kind Regards and thanks,
Malte
SolidworksApi macros 0
