How to "refresh" a revision table in existing drawing

I am using SW2011 with SP3.

We reworked several of our templates a while back. Now that we are into the double-digit months we are finding that the Date column in our revision table is not wide enough and when inserting a new revision the date causes an unwanted carriage return.

The revision table template has been updated to the correct width. The drawing template has been resaved with the updated revision table. However, any drawings that were created prior to correcting the templates have the incorrect revision table column width.

RMC, Format, Column Width, type, type, type, Enter... gets to be tedious. I tried double clicking on the column border but the auto-adjust seems to either do nothing or grab the neighboring column and resize that. RMC the drawing, Properties, Reload template is grayed out. Tried changing templates and then changing back but still no update.

Just wondering if there is a handier way to update the revision table to the current template? Something better than formating the column width.

Thanks, Daen

SolidworksDrawings And Detailing
Answers 4
SF
SF 2011-10-26 Best Answer

I'll play Catain Obvious here.  For us, the exact formatting is not important so we just drag the column width to suit.  But we are also a project based company and therefore any particular drawing will be used mostly one time so it's not as important to us.

  WT

DH
DH 2011-10-26

Wayne,

That is probably the best approach here as well. I assumed it was a SW shortcoming but was hoping there might be something I was missing.

Thanks, Daen

SM
SM 2011-10-27

Daen,

Is your company the type that keeps multiple revisions on the drawings?

If so then just dragging the column over is your best bet.

If not then you can just delete the existing and then insert the updated one.

DH
DH 2011-10-27

Scott,

We do keep the revisions on the drawing. I tried the delete and replace option. That takes about the same amount of steps as formatting the existing.

This isn't a show stopper. But I have had to go back and modify several drawings after being checked into the vault because this little formatting issue was not noticed (by me...). So I was just looking for something a little more automated I could assign to a shortcut or 3D mouse button until we get this batch of drawings updated.

Looks like the short answer is to just trudge through it.

Since I am becoming a deciple of the "S" shortcut key, procedures that take multiple steps begin to become an annoyance. Especially if going through dozens of files at once performing the same set of tasks. This one was starting to bug me so I figured I'd ask. And I got the answer I was expecting - just not the one I was hoping for.

On to the next battle...

Thanks, Daen