We save drawings as PDFs on every revision. I have a task set up to convert drawings as PDFs on release and it fails when the PDF for the previous revision is already saved and checked in in the destination folder.
Is there a way to force overwrite the existing PDF? Or maybe run a quick check out > overwrite > check in in the background? Thanks.