How do I use the same BOM on multiple drawing files?

Has anyone tried to link a BOM to an external excel file, then use that same BOM in another drawing file while keeping everything linked to SW parts and assemblies? How well did it work? Especially when keeping bubble numbers straight.

I am using SW 2017.

SolidworksDrawings And Detailing
Answers 9
AK
AK 2017-02-24 Best Answer

You can add configuration of 3D model and separate BOM up to configuration for easy to use.

JS
JS 2017-02-24

I don't think you can link the BOM from one file to another as you would like, however, you can use the same BOM template and the part placement in the BOM copies the instances of the parts in your feature tree and that would keep your balloons the same, unless you have added parts etc... 

SF
SF 2017-02-24

I think you could insert the assembly you want the BOM related to and just position it off the screen. The drawing file will be larger of course but it may be worth it to you.

SM
SM 2017-03-01

Not really, as the item number from one has to match the other. I'm making it work in this case by manually making every bubble number in the non-BOM drawing. *shrug* Tedius and I have to manually check it for every new changes, but that is my best solution so far.

SF
SF 2017-03-01

Have you tried this with a multiple sheet (tabbed) drawing?

AR
AR 2017-03-01

How about copying the sheet with the BOM and the View to the new drawing, then you could move the View of the Page. create a new View and link to the BOM.

comment imagecomment image
GS
GS 2017-03-01

A couple of people have mentioned moving a drawing view off the sheet after inserting a BOM.  You can also hide the view, or just delete it.  After being inserted BOMs are linked to the Assembly, not the drawing view, so they'll remain parametric even if the drawing view is deleted.

SM
SM 2017-03-01

Not usable in this case. Bosses want these two views in separate drawing files. I can change the sheet format of course, but that is even more trouble.

SF
SF 2017-03-01

So be it then. Even as a contractor I told my bosses that what they wanted was not conducive to proper practice or that the result was not in accordance with their needs going forward. I could imagine the guy coming in after me wouldn't hesitate to place the blame on me for a 'mistake' that wasn't one. I still love these 'challenges'!