How can I put all of my old vendor files into the Workgroup PDM vault? We just set up Workgroup PDM at work and I need to put all of our old parts and assemblies from our vendors in the vault. What is the easiest way to do this?
SolidworksWorkgroup Pdm
The most basic way is to open the files one at a time and check them in individually to the vault folder where you want them. I don't know if you can check in a whole folder at once. If you have a ton of parts and you want a faster method maybe you could add them all to an assembly by dragging them from windows, then check in the assembly (which will check in all the parts too). Then delete the assembly form the vault.
You can use bulk checkin form the vaultadmin: 2014 SOLIDWORKS Workgroup PDM Help - Bulk Check In