Export/Import from Vault from different servers

Is there a different way to transfer the  setup between Vaults in different Servers. I tried to export Test Vault from local machine to a real working Vault in the server  and not all setup importing correctly to the new Vault in the server

SolidworksSolidworks Pdm enterprise Pdm
Answers 7
PB
PB 2018-05-20 Best Answer

Assigned folder permissions are ported over using a CEX file. Also if you are importing workflows and you already have a workflow of the same name in the vault, then it will not be overwritten, but rather you will have the same workflow with a (2) next to the name.

Finally, templates may not import if you haven't created a local vault view of the vault you are importing into.

Kind regards

Prasad

JB
JB 2018-05-21
<p>Prasad Bhonsule wrote:</p><p></p><p>Assigned folder permissions are ported over using a CEX file. Also if you are importing workflows and you already have a workflow of the same name in the vault, then it will not be overwritten, but rather you will have the same workflow with a (2) next to the name.</p><p style="min-height: 8pt; padding: 0px;"></p><p>Finally, templates may not import if you haven't created a local vault view of the vault you are importing into.</p><p style="min-height: 8pt; padding: 0px;"></p><p>Kind regards</p><p style="min-height: 8pt; padding: 0px;"></p><p>Prasad</p>

Thank you, ​

PDM standard has only on workflow. I tried both ways as you suggested and neither way works

JS
JS 2018-05-21
<p>Jake Bakerin wrote:</p><p></p><p>Is there a different way to transfer the setup between Vaults in different Servers. I tried to export Test Vault from local machine to a real working Vault in the server and not all setup importing correctly to the new Vault in the server</p>

What things didn't work correctly in the new vault?

PB
PB 2018-05-21

Hello just read my reply, it should read "Assigned folder permissions are NOT ported over using a CEX file." Apologies for any confusion.

If you are using PDM Standard, then importing a CEX file with a workflow will not work even if it's a different name, as PDM Standard only ever allows 1 workflow per vault.

JB
JB 2018-05-21

Prasad,

What's you suggestions of transferring a workflow from one Vault to other in PDM standard?

PB
PB 2018-05-21

Hi Jake, when creating the new vault, create it as empty, then you will be able to transfer across.

Kind regards

Prasad

JB
JB 2018-05-21

Bingo ! Thank you, @Prasad

Creating a new "Empty"  Vault makes it easy to import the setup including workflow from different Vault