Our company has an EPDM Vault, but has had no rules on how to use it. So things are a mess from 5 years of random use. There is one workflow, which we no longer want. And file history, which we do want.
Goal:
4 brand new workflows set up (one for each division of the company, with their own requirements)
Existing workflow goes away (deleted or hidden but not in use)
All unnecessary files deleted (cleaned up)
New folder structure - all remaining files moved into their new correct location
Remaining files switched from old workflow to new workflow(s)
File history kept for all files.
Can anyone point me towards the best way to achieve this?
Should we
-Create a brand new vault with new workflows etc and move all parts into that?
-Create new folder structure within old vault, move files around, and apply new workflows in old vault?
-Other?
I'm creating the new workflows in a test vault, but am not sure how to proceed once those workflows are complete.
Grateful for any guidance
Thanks
Chris
SolidworksSolidworks Pdm enterprise Pdm
Update: I've been advised of a potential way to do it is this:
-clone existing vault
-practice all workflow modifications, etc in that cloned vault
-manually re-create all of those successful mods or new workflows in the existing old vault
-have a "workflow link" from old workflow into new ones
-manually transition all files from whatever state they're in now into corresponding states in the new workflows
Was told to avoid porting files over to a new vault because they would lose their history
I think I agree with that. I would just add that you can't delete a workflow state that was ever used by an existing file, but you can rename them. So I would try to reuse the states you have (and it sounds like you will be adding more). If you rename a state the name will change everywhere (including the history of existing files), but that is probably better than having abandoned states.
"Manual" transition to new states can be aided by searches.
Avoid complexity. You can always add more states later.
I understand why you want to use the old vault with the original files so you don't lose history but why would you not export the new workflows over instead of recreating them. By recreating them you have a high probability of making an error somewhere. This means that you would have to do testing all over again in the old vault to verify that you didn't forget something or make a typo.
Thanks Brian. I was going to completely abandon the existing workflow, and through workflow linking, port all files into one of the four new workflows. The old, fifth workflow would then be hidden to all users.
Thanks Stephen. That's a good question. I think I will do it as you've described.