I think there's a simple solution to this problem, but I can't seem to find any help. I think it stems from not knowing how to word the search. I will provide a scenario in hopes to get an answer.
I'm trying to carry a measurement from one sketch and use it to drive the length in a separate sketch.
In sketch 1 I created a line with a specific length (50mm). Sketch 2 (on a different plain) I want a line to equal that measurement. And when I change the measurement in sketch 1, it will automatically change it in sketch 2. In other words, I want the measurement in sketch 1 to drive the measurement in sketch 2 How do I do that? thanks
SolidworksGeneral