Converting vault documents with Task scheduler

I am Trying to convert my vault documents. Is anybody struggling to update drawings? I have not had one drawing update for me.

SolidworksWorkgroup Pdm
Answers 8
BB
BB 2010-01-17 Best Answer
When looking back thru my tasks, it looks like Solidwork got hung up a drawing and after that failed every drawing. It did continue to complete parts and assemblies. If I shut down the tast scheduler and restart it, the new tasks that I start, update drawings. I must say, this is the by far the worst part about the upgrade process.
SF
SF 2010-01-18

Hi Brian,

     I have not been able to get the out of the box task scheduler to work with files in the vault.  Are you using it with EPDM?  Whenever I try to use the task scheduler to update files it gives a message "The file is read only, the task will not be scheduled."  I had to use the EPDM File Version Upgrade tool to upgrade our files and still had issues with drawings and assemblies.

Good luck!!

Lucas

SF
SF 2010-01-19

I very seldom get Task Scheduler to work on anything.  SolidWorks or Windows TS.

BB
BB 2010-01-19

We are using Workgroup PDM.

I am finding that one file in the project I am updating is causing all of the following files to fail.

JH
JH 2010-01-19
I have not used Task scheduler very much, but one thing I noticed is that is not very forgiving. As you pointed out, it seems to stop the process at the first problem rather than continuing and giving a summary (10 files have been updated, 2 were not) after the process completes.
SF
SF 2010-01-19
I recently  converted our Vault to 2010 version with the same sort of results Im seeing from others in this thread. I found that the only way to do the job reliably is to convert parts first, assemblies second and finally the remaining drawings. Tedious and time consuming but at least it worked.
JM
JM 2010-01-22

make sure you update the files in small groups.  If your vault is very large, that's alot of open/update/copying to do.   The last time I used the TS, as soon as I updated smaller clusters of project folders it didn't hang.

Also make sure the computer you're running the task scheduler on has plenty of HP and disk space to handle the conversion.

I plan on updating the files during our 2010 upgrade, so hopefully it will go smooth.

SF
SF 2010-01-27

I used the Task Scheduler (2009 sp5) to update 3,164 files. Very fast, about 5 hours. I've seen only about 12 failures, most have to do with Toolbox files.

2009 sp5

Windows 7 64bit

Devon Sowell

http://www.pdmsolution.com