We are making the jump to SW 2015 from 2011. Currently we have two engineers (myself included) with plans to add another. Right now, my computer acts as a server of sorts. I access work files on my local E drive and my partner also accesses my E drive but, obviously, as a mapped network drive. For the most part we do not have any conflicts. The bulk of our work involves large water chillers for printing presses. There are many subassemblies that are common across projects in addition to a common library of parts. Like I said, for the most part, we do not have many issues with read only parts etc, especially because it is just the two of us.
In a general sense I am looking for some guidance in setting up a vault for the very first time. I am also looking for information as to how we would start working in this vault. Im asuming that it is going to be quite a change for us and we will have to get used to doing things differently. For instance, we may be working on 'Machine A' but need to also work on 'B' and 'C'. Would we need to check in and out of projects before working on the others? Right now we would just open up whatever assemblies we would like to work on.
If I were to zoom in a little, I would have the following question:
I see a need for better revision control. Right now, if we need to revise a common subassembly, we 'save as' while working on the main assembly (so that we capture the reference change). Usually, a project that we have finished wont need to use the newer revision because the machine has already shipped, but if we want to make the machine again, which happens semi-frequently, we would, of course, like to make sure we are using all of the current revisions.
So, one of my understandings with the wPDM is that when you make a revision then you can update and revise all of the assemblies that reference that subassembly. Is that correct? What if there are assemblies that reference assemblies that reference that subassembly? Would they also get revised?
I hope that I dont sound too scattered here and I appreciate any feedback you all can give me. The last thing I want to do is start off unprepared and have this turn into a half-baked cluster! If I think of any other questions I will post them here.
Thank you in advance!
-Nick
SolidworksWorkgroup Pdm
Hi Nick, you bring up a good question and you've come to the right place for answers. There are hundreds if not thousands of experienced individuals ready and able to provide insights. The problem you'll discover is that many points of view conflict and and many scenarios call for contrary settings.
That being said, I'm going to answer your specific questions and then propose actions for your consideration.
First, how it works:
WPDM is, under the hood, just a huge mass of folders, solidworks files and text files. There's no SQL server, no sharepoint, no replication, no encryption, none of that. It's pretty basic file service, archiving and revision. If you're going to work remotely, or if you want to bring suppliers and customers into the system, you're going to need to look at EPDM or Smarteam or one of the other PLM/EDM systems out there.
When you set it up, you'll have a root folder on one computer that you'll call a vault. That same computer will run an executable server process that will be responsible for handling all requests (called transactions) with the files in the vault. It's like the old days when you had a document control clerk who you went to for drawings, revisions and copies. The vault service handles assigning files for modification, archiving old revisions and renaming and retreiving files as well as running back-ups. No one touches the files in Windows except the vault service.
On your machine and those of your coworkers, you'll be able to access those files through SolidWorks explorer or through the WPDM Add-in for SolidWorks that runs in the task pane. The UI organizes the files in a project tree, showing in each project branch, assemblies and unparented parts as the root level documents and their references indented unerneath them.
References are laid out in WPDM similar to the way they appear in Pack-n-Go or File==>Find References with one noted exception: only assembly references and drawings are shown. External Modelling references are called out in the part details interface, but not the main view. There is no limit to the number of levels a tree will reference and this is not something you have to worry about when you perform vault operations.
The tree is generated automatically when you add files to the vault. If a part or subassembly appears in multiple assemblies, it will display with a regular icon in the project or subassembly where it's first checked in and in all other cases, it will appear as a version of that icon with an additional glyph to indicate it's a link.
You don't have to worry about where a file is referenced, however. Unlike Windows explorer, WPDM does not allow two files with the same name to be checked into the vault. So despite a reference showing up in multiple folders, there is only ever one actual file to modify.
As a matter of fact, you don't have to worry about where things are in the vault for anything (unless you specifically restrict user access to some projects). You can move files around, rename them (you have to have write permission the file and the files that use it) take ownership, change revisions-anything you feel like doing-without worrying about missing references or duplicate files. WPDM manages all of the file handling logistics.
Making changes to files is similarly a straightforward process and it generally services three concerns
1) you only want one person editing a file at a time
2) you want a backup of the original
3) you only want to modify those files that are affected by your design activity
Each of these concerns is serviced by revision control and ownership.
If you intend to modify or update a document, you take ownership of it. This flags the document as being under revision and your coworkers will be able to see this through icons displayed next to the file in the vault view. Until you release ownership of the file (which can be set to happen automatically) your coworkers will have read-only access to it. They can check out the file, reference it in their assemblies and do all the groovy things you do with files, but only you can check-in changes to the file.
So what does checking in a file mean?
Checking in and Checking out files are how you gain access to them. To facilitate good performance and avoid permissions conflicts, SolidWorks will copy to your workstation, any files that you need whether you own them or not, All of these files go into one folder and if you already have a file in that folder that's the same or newer than what's in the vault, it doesn't get overwritten-meaning you only wait for the files you need to copy down from the server.
You then work locally out of that one folder, modifying the files that you own, and when you're finished, you check back into the vault the files that were modified-and only those files. This might sound more laborious and complicated then just opening a file in Windows explorer: OMG, you have to look through the vault, find the files on your ECO, take ownerhsip of them, check them out and then you get to the open dialog box to finally edit them in SolidWorks, Sound like 10 minutes worth of work before you can open an assembl doesn't it? Fortunately, WPDM macros a lot of these tasks quite efficiently. When you check out an assembly, WPDM includes all of the referenced files for you and automatically opens the assembly in SolidWorks. You can take ownership of multiple files and entire assembly trees in one shot, so it's not like stacking bricks or anything.
Checking files back into the vault, is similarly automated. You can do that from the SolidWorks menu, while you have the file open. SolidWorks will round up all of your references, show you what's newer than the file in the vault and, get this, only transfer back to the vault only the files that you own and only the ones that have been changed. So even if you own a heat exchanger subassembly, WPDM doesn't copy it across your network to the vault unless it's been modified. This saves your network bandwidth-which is important if you have 3 guys sharing an 802.11n wireless router.
For each file that's overwritten on check-in, WPDM will archive it's version and the file that takes its place will be given a new revision. This part is a general description of WPDM's functionality. You can configure exceptions. Once checked in the updated files are served instead of the archived versions whenever you perform a file transaction. WPDM doesn't automatically replace the outdated files on everyone's machine, but it does provide notifications of which files are out of date and prompts users to refresh them from the vault when they're loaded.
WPDM not only backs up files, it backs up product configurations (not the same things as configurations like you see in design tables). That means that you can open open a previous version of an assembly and optionally retreive all of its references at the revisions they had when the assembly was checked in. Effectively, you can go back in time. Try to do that in Windows explorer and you have a nightmare of multiple dimensions.
When your change is complete, you release ownership of the files and they become available for someone else to modify. WPDM also includes support for basic lifecycle states if you want to incorporate your approval and release cycles, but, really, this is the point where you want to look at EPDM.
When it comes to setting up WPDM for your organization, I usually give the following advice:
1) Do the Workgroup PDM tutorials included with Solidworks or better yet, have someone from your VAR come into your office and do a half day of training for everyone. This software isn't complicated once you get your head around it, but if you try to figure it out as you go, you'll miss out on a lot of time-saving functionality, hose your vault setup and probably develop some bad habits. If you have multiple engineers tuning into this thing then having a unified training session where everyone hears the same advice is a must.
2) Decide what part of configuration managment you're going to have WPDM do and what you're still going to need people to do. WPDM doesn't handle ECO's, doesn't update ERP systems, doesn't do purchasing, routing or scheduling. All of those tasks are going to be handled by other departments and people and you want to make sure that the software doesn't duplicate or interfere with these tasks. For example, if revisions and eco's are implemented by QC, there's no point in having WPDM automatically add lines to the drawing revision block, otherwise, every incremental change to a file will generate a new ECO and your design process will bottleneck at configuration managment. In that case, let the engineer modifying the drawing add the revision line for major changes in accordance with an ECO and then submit only the final version of the drawing to configuration management.
3) Make a plan: In a word doc, write out an implementation plan that explains the role of the vault, what jobs it's going to do and then, go through the setup, page by page and write down your reason for everything. Six months from now, when someone complains that they can't change a files project, it would be good to know the reason you set up the vault to restrict users from doing that before deciding to start doing the opposite. Include screen captures of all of your setup pages in this plan, so that you know how the vault was configured when you released it. If there are any procedures you want users or admins to follow, document those here. -And when you make changes to the vault configuration of any kind, update the plan and include a date-implemented.
4)Test your configuration in isolation before you implement it. Written another way, Never test a vault on live data. It takes extra time to create a dummy vault, but it's the only responsible way to see if the changes you made will work the way you expected. You don't want to do something major like adding a library and then discover that you don't like the way it works.
There's some general advice to get you started.
good luck.
I'm happy to share my knowledge of WPDM with you, but I think John gave a very thorough overview. If you are still confused about anything or have any new questions I'll be happy to chime in.
Thanks John. You gave me a ton of very useful information that I will use to implement the wPDM. Im in even more of a hurry now that I realize that the Solidworks search function is completely non-existent over a network (in Windows 7 and 8). A couple of questions to keep me going though.
1. Ive been watching youtube tutorials as well and I think I have a hang on how I am going to use Projects vs Sub-Projects. For instance, I will have classes of projects 'Industrial Chillers', 'Press Chillers', 'Bottling machines', '...'. When we get a new order for a chiller we will create a sub-project for that new order. I will allow users to create Sub-projects. Im assuming that this Sub-project list can grow to as many items in the list as we want, correct?
2. With an empty vault, how do I start adding the contents? Where do I add parts and sub-assemblies that we currently use in many different projects? Where do I add existing projects that havent been through wPDM? Do I just move over my 'important' folder and plop it in the vault? Our 'important' folder contains all of our projects as well as standard parts and subassemblies.
Another question. If I am working on a project and some of the parts are getting revised and updated. Should I not check the project back in until all changes have been finished in order to avoid revising the file at the end of every day, or session? I guess, said another way, I see that every time you check a file or project back in and if you have made any changes to that file the wPDM will advance the revision even if Im technically not done making changes. Do I need to change my revision scheme? Right now, we only actually save a revision to a part that is ready to produce. But, Im wondering if I need to have secondary numbers in my revision with a move to the next letter only when we release to production.
Yes, you can create as many levels of subprojects as you want-at least I've never run into a practical restriction. However, and this is really important, the only real functional value of a project folder is to know where to put something. You'll have all manner of searching a reporting tools to locate files, but your storage paradigm needs to be self-explaining and straight-forward or you're going to have misfilings all over the place and you'll waste enormous amounts of time trying to make your file structure consistent with your organizational paradigm. In other words, don't go nuts on tree structures because they don't carry a lot of benefits. For every assembly, WPDM will display the complete set of references for it, even if they're stored in other projects, so it's not like Windows Explorer where every file is in a cilo.
To answer your second question, you'll use the Bulk Check-in tool accessed on the Projects tab of the Vault Administration tool. They'll take you through using this tool in the tutorials, hopefully. (I don't remember if that was included or not). You should defininately practice with this tool several times to make sure it's capturing the metadata the way you want. I t's hard to fix descriptions, revisions and that stuff after the fact, so make sure you know how to get it right before you do a large file import session.
To clarify, you take ownership of and check-out files not projects and additionally, you don't actually remove the files from the vault. You're served a controlled copy.
Now, what happens if you're working on a project and your colleague gets a change order that involves changes to some of the files you're working on?
Take Solidworks completely out of the picture and ask how this is handled at your company now?
If you have a configuration management team and an engineering change order system, then in all probability, you're not going to be able to add a component to a new eco that's already included in another open ECO.
How this is handled varies, but where I worked, we would either combine the ECO's, all of the shared component modifications would be placed on one ECO, the new ECO wouldn't be initiated until the existing eco was closed.
None of this complicates how you work in SolidWorks with WPDM.
When you receive a change order, you take ownership of all files that are affected by the scope of the changeorder. Those files will display in WPDM as being assigned to you. Until you release ownership of the files, the other users will only be able to open those files in read-only mode. A file can't be owned by more than one person at a time. Now, there are some circumstances where a user can write changes to a file flagged as read-only by the vault, but usually that doesn't happen by accident. Let's say that did happen. When the user went to check in their assembly, the modified file would show either a green arrow or a yellow warning glyph indicating it's different from the file in the vault, but they wouldn't be able to check it in, because you have ownership of it and the vault knows this.
Now you can get into situations where you need more sophisticated tools. Maybe you only want someone to be able to pull down the released version of a model as opposed to the InProgress version that someone else is working on. You may not want every sandbox edit to be treated as approved for release. In this case, you should look into using Lifecycle states and linking them to user permissions. If you need things like effectivity or sign-off or deviations, then you should really look at EPDM.
In regard to your revision scheme, there are several ways to address your situation. I suggest reading carefully the WPDM help on the following subjects:
Working Copy
Secondary Revisions
Allow latest revision overwrite
I use a two-part revision scheme. The first term of the revision is the revision letter that shows up in the drawing titleblock and revision table. The second term is a number for incremental changes that I want to track.
My primary revisons go 0,A,B,C,D where A is initial release. So 0-01 through 0-99 can be used for all of the incremental saves and submittals between receiving the change order and releasing the drawing. This requires that I uncouple the revision table from the WPDM revision version, but honestly, I'd rather the designer add the row for the revision. It's one click. So I know that a model at revision B-01 has had a change since it was released at rev B that hasn't gone into effect yet. When the ECO is released, the CAD Admin bumps the revision to C. That's paraphrasing our process, but in a nutshell, that's how it works.
In general, WPDM has a pretty restrictve revision scheme. I don't like that every file in the vault has to have a revision history and I dont' like that I can't define the approval process or automatically send notifications. Like I indicated, if these limitations get to be issues, then you need to look at EPDM.
Hi Nick,
The others have given you great info on how to use the vault.
I just wanted to caution you on jumping to SW2015 yet. There seem to be some issues with WPDM in SW2015 at the moment. If you need to upgrade now, consider SW2014-SP3. Otherwise wait for a confirmed patch to WPDM for 2015 version.