BOM created in assy - how to import (automatically?) into drawing

How does one get a BOM created in an assy to import into the drawing? Is there a way to have this happen auotmatically each time the component is placed on a sheet?

Thank you very much!

SW 2012 SP1.

SolidworksBill Of Materials