Sorry if this has been asked before, I could not find the answer by searching. I've already created about 25 assemblies for a project and have done a drawing for each one that includes the BOM and location (balloon). I've always have went back in and manually exported each BOM into an excel spreadsheet. I want to know if it's possible for solidworks to do this automatically for all 25 assembly drawings if I select the folder they are in (task scheduler?)
SolidworksBill Of Materials