Hi All!
I was working with the optimization component in Isight, and I need to run 200 cases: for the first 100 cases have a variable "A" and a constant "B", and for the next 100 cases "A" would be constant and "B" a variable. In the model I have more variable as "C", "D", etc.
Anyone knows how can I do that?
