Up to now, we never checked the material stock to plan our production. The material charts was only used to check inventory.
Now, we want that several ressources wait with the beginning of the production step until the external material is on stock.
I activate the "material allocation" and the "raw materials" in the configuration.
Do I have to set a flag in B_NOME or B_OPE?