A machine producing two different SFG simultaneously: How to configure the scenario in ORTEMS PS?

Hi, 

In my wire manufacturing plant there is a set of machine which produces two different SFGs simultaneously. Both SFGs usually get produced in the same time but there are scenarios also due to tool constraints where only one SFG is getting produced .Both SFGs has different set of master data defined in the SAP. What would be the best way we can define and model it in ORTEMS PS . Please suggest.

PS: Should we define separate machine for two outputs?