If requirements are listed in a Word file with a structure like the table below, is there a way to set up Reqtify so that requirement A is covered by requirements A-1 and A-2?
| 1st layer | 2nd layer | REQ_ID |
| Requirement | A | |
| Requirement | A-1 | |
| Requirement | A-2 | |
| Requirement | B | |
| Requirement | B-1 | |
| Requirement | B-2 | |
Also, this structure is repeated in the same table. Can we correctly set up the referential integrity constraints for these relationships?(Regarding Requirement B)
