[Best Practice] Locked views for drawings?

I am curious to hear people's opinions on the use of locked views in drawings. I have always thought that it was best to leave drawing views as unlocked so that you can see when a view becomes out of date, but I know many companies require drawing views to be locked. Does anyone have strong feelings about one method over the other?