We recently purchased and installed PDMWW and need help inimplementation and organization. I have read posts that suggestnumber of files in a project should be limited to 200-500. We haveseveral product lines with several hundreds of parts under each.How should we structure the files? If we have a high level project(for every product line) with a project folder for every partnumber, will all the files in all the sub-folders cause a slowdownfor the top level folder?
Is there published PDMWW documentation/guidelines/user manual fromSW that will help us understand these possible issues? Where can Iget them?
What has been the best training method for admins to understandPDMWW? If things go wrong, how easy/difficult is it to reorganize?
We would like to use PDMWW for document approvals and release.Depending upon product line, a document requires differentapprovals (number of people and departments). Is it possible to setdifferent release requirements?
Any suggestions on PDMWW implementation are welcome.
Thank you.SolidworksWorkgroup Pdm







Is there published PDMWW documentation/guidelines/user manual fromSW that will help us understand these possible issues? Where can Iget them?
What has been the best training method for admins to understandPDMWW? If things go wrong, how easy/difficult is it to reorganize?
We would like to use PDMWW for document approvals and release.Depending upon product line, a document requires differentapprovals (number of people and departments). Is it possible to setdifferent release requirements?
Any suggestions on PDMWW implementation are welcome.
Thank you.SolidworksWorkgroup Pdm

with a large assembly, it's not likely that all files arefabricated. therefore, a portion of the files (fabricated parts andassemblies) will be under the parent project, the remaining fileswill be under various other projects, oem (sub-projects here),standard library (toolbox), shared components from anotherproject(s), etc. these components will be displayed as a link inthe vault. this process helps you to disperse your files intomanageable (performance wise) projects/folders.
2) no.
3) on-the-job-training. VAR's offer a 4 hour class. it covers bothadmin and general usage. 4 hours should be a clue. this system isvery basic, but it does a wonderful job for the most part. mostthings are easy to fix, others not at all easy. my 4 biggest tips;
a) name your folders wisely, as they cannot be renamed
b) set up groups to control user rights
c) use lifecycles to control file access related to user groups andfile status
d) filename = part number (nothing else should be tacked ontofilename).
as far as item 3a is concerned, I wanted my folders to display in acertain order. i controlled this with a numeric identifier in frontof project name. this allows you to force a particular sort order.
e.g.
050 Projects (Projects)
Subs under here
100 Released (Released)
Subs under here
150 OEM (OEM)
Subs under here
200 Obsolete (Obsolete)
Subs under here
The project description is in parentheses. In PDMW client set labeloption to display project description instead of project name, thisway users will not see this numeric identifier.
4) workflow is the term you're looking for here. pdmw does not havethis. there are some automated things you can do with "lifecycles".however, they are very limited as to what you can do.
hth
3e) revision scheme, do not change. you can think about it, butdon't do it.
you can certainly change things while experimenting. but once yougo live resist the urge to make the changes i've listed.