Hey all,
I subitted this to Sw a while back but never heard. Wondering if anyone else sees something similar.
try this and you can look at the attached pics for reference. I have 2 horizontal runners (W24x104) and 3 stringers same beam. At the beginning of the runners the first stringer beam is perpendicular and the face of the flange is flush with the end of the runner. The other beams are spaced out as needed. By doing this, the cut list groups the 2 runners, the 2 inner stringers and the end stringer is separate. The only way I can get them to group as 3 stringers is tofake the dimension for the location of the first stringer so it is offset by 1/16" finside the end of the runner. I hope this is understandable.
If you look at the second picture you will see how I had to offset.
Does anyone else have this problem? I sent it to my VAR who duplicated it and reported it to SW but have heard nothing since. Wondering if anyone else has a better solution. Offsetting the beam 1/16" looks kinds stupid and is just within our tolerance. I prefer to give more accurate info.
The option that I was given was to move the lone beam to the other folder in the cutlist but that messes with the automatic updates.SolidworksWeldments
I subitted this to Sw a while back but never heard. Wondering if anyone else sees something similar.
try this and you can look at the attached pics for reference. I have 2 horizontal runners (W24x104) and 3 stringers same beam. At the beginning of the runners the first stringer beam is perpendicular and the face of the flange is flush with the end of the runner. The other beams are spaced out as needed. By doing this, the cut list groups the 2 runners, the 2 inner stringers and the end stringer is separate. The only way I can get them to group as 3 stringers is tofake the dimension for the location of the first stringer so it is offset by 1/16" finside the end of the runner. I hope this is understandable.
If you look at the second picture you will see how I had to offset.
Does anyone else have this problem? I sent it to my VAR who duplicated it and reported it to SW but have heard nothing since. Wondering if anyone else has a better solution. Offsetting the beam 1/16" looks kinds stupid and is just within our tolerance. I prefer to give more accurate info.
The option that I was given was to move the lone beam to the other folder in the cutlist but that messes with the automatic updates.SolidworksWeldments

How do you make the previously described weldment and keep the stringers grouped together?
rmb on the cut list and uncheck the "automatic" option.
Please try and put a sample together if you have time. Run 2 wide flange beams parallell at say 80" long. Then add stringers of the same beam between them. The first stringer will be even with the front of the runners. Cope the stringers and see if it propagates the cut list correctly.
As I said I sen't this to my Var and he duplicated it but SW told him to do a manual cut list. Doesn't make sense.
Thanks
Steve Gioacchini wrote:
(snip)
As I said I sen't this to my Var and he duplicated it but SW told him to do a manual cut list. Doesn't make sense.
Thanks
the cut list will "never" really be truly automatic, your example proves that.
there have been other posts referring to things that should or should not be grouped but Solidworks seems to have a mind of it's own.
fight it all you want, it's a losing battle though.
btw, you must zip your files prior to uploading.
See attached file. I don't see the issue. What version of SW and SP are you using?