Unable to retrieve old Working Copy revisions

An example in 2007:

Create an inital revision at, let's sayREL
Create a Working Copy rev atREL+
Create another primary revision at001

We're no longer able to retrieve the Working Copy (REL+) rev fromthe vault, even though it still exists in the vault structure (inWindows Explorer). If we check out theREL revision, it is in fact the originalREL revision (like it should be), not theREL+. I could be wrong, but I could swear that this waspossible in 2006. We have not altered any vault settings since theupgrade. Are we missing something that could make this optionavailable?

Thanks
SolidworksWorkgroup Pdm
Comments 19
PY
PY 2007-02-20
Scott,

Working revisions are not kept in the vault once you roll yourrevision to the next version. You can't rollback to a working copy,because they are not saved when the next revision supercedes it.You can consider that the working copy always gets overwritten bythe next check-in, whether its another working copy or a releasedversion. When you look at the history for the document, yes you seethat it has gone through a working copy, but you can't get back toit once it has been overwritten. This has not changed compared to2006.

Pete
JB
JB 2007-02-21
If you take ownership of a existing part in the vault andselect "delete / rollback", you have the option to roll the fileback to previous revision. However check your vaultadmin setting.Make sure in the "Delete, Rollback, Archive documents" section youdo not have "No one" selected other wise this won't work.
SF
SF 2007-02-21

Scott Carroll wrote:

 

An example in 2007:

Create an inital revision at, let's sayREL
Create a Working Copy rev atREL+
Create another primary revision at001

We're no longer able to retrieve the Working Copy (REL+) rev fromthe vault, even though it still exists in the vault structure (inWindows Explorer). If we check out theREL revision, it is in fact the originalREL revision (like it should be), not theREL+. I could be wrong, but I could swear that this waspossible in 2006. We have not altered any vault settings since theupgrade. Are we missing something that could make this optionavailable?

Thanks

It's always worked like this.
Never been possible.

Once the next rev has been checked in, the working copy (half rev)is deleted.
it's gone forever!
SF
SF 2010-08-12

It's been a long time since I looked at this one...

What I originally tried to explain was:

When I allow a working copy revision to an existing revision (i.e. REL+), I'm intending THAT revision (REL+) to now be the latest and greatest available rev, NOT the version prior to the latest working copy (i.e. REL).  Otherwise, why even have a working copy and just go to the next full rev. The way the vault handled it was to effectively ignore that the working copy rev ever existed (in the context of rolling back).

As far as I'm concerned, once I add a "new" working copy, THAT should be the live rev.  Once I go to the next full rev (i.e. 001), I should then be able to roll back to the latest revision, which should be the one that happened to be previously flagged as a working copy.  I would expect the working copy (REL+) file to become the last available REL file as soon as I move to the next full rev (001).  I don't care that it's not called REL+ anymore, I just want to be able to get the absolute LAST available version of REL that was added to the vault.

As it happens, I'm no longer using PDM at my current business, so this issue may be a moot point by now, given the time that's passed.  I know that it was still present into 2009.  If this has changed, my apologies for the post....(nevermind).

KB
KB 2010-08-12

working copy is just a temporary rev, "it does not count as a real revision".

the absolute latest rev is the one "before" the working copy +.

e.g. A, A+, B

the absolute latest version available before B is A.

in my mind it should always work like this.

hth

SF
SF 2010-08-18

To me, if I go through the trouble of overwriting a revision (ala working copy), my intent is for it to be a "good" revision.  If I wanted a temporary revision, why bother; I'd just leave it on my hard drive.  Writing a working copy over a full rev is still updating a good rev.  Until I go to a new full rev, when someone wants to get the latest version, they will (as intended) get the latest version, which happens to be the working copy.

When I go to the next full rev, why would I want to abandon that?  That working copy should remain the latest (previous) full rev as far as I'm concerned.

SM
SM 2010-08-18

You may have to go into the PDM server itself through Windows explorer and search through the

file structure to find the revision you are looking for.

I have had to do this before.  You have to know how the folder structure is setup before you even attempt this.

KB
KB 2010-08-18

1

"if I go through the trouble of overwriting a revision (ala working copy),"

I think you might be missing something.

Working copy does not overwrite a revision.  It only overwrites itself.

Working copy = 1/2 revision

In fact we use ½ instead of the + sign for our working copies.

This really drives home the function of the working copy.

Think a bit more about the term "working copy", to me it means;

in process,

or still progressing,

or not complete

2

"Writing a working copy over a full rev is still updating a good rev."

This is incorrect.  Working copy does not go "over" the previous revision.

The previous full revision is still there.

*****

Working copy is invaluable for EC's or Engineering Changes.

During an EC process an engineer or drafter might checkin several iterations of a document for of any number of reasons.  In this case working copy is an excellent means to accomplish this continual overwriting process.

Once the final document is signed off, it can be checked in at the next full revision.  No one cares about the numerous overwrites (working copy) to get from Rev A to Rev B.

Would you really send out a document for procurement with "Rev C+" in the title block?

hth

SF
SF 2010-08-18

I understand.  I'll give you an example of what I mean:

We check in a full rev (i.e. 001).  During our release process, someone spots a missing approval or an incorretly-typed date on a drawing.  This requires going through the trouble of checking out the file, deleting the full rev (or rolling it back to the previous), then checking it back in (again)...OR...fixing it WITHOUT creating yet another full or secondary rev. by using a working copy.  As far as we're concerned, it is now the "good" revision.  Our permissions/life cycle setup controls its protection (as far as over-writing it with another working copy).  If I can put it IN the vault, I should be able to RETRIEVE it from the vault.

Any other instance where a user checks out "Latest Copy", they'll get the working copy, as they should.  Why should it work any differently once I go to a new revision?  Our goal was to not over-use secondary revisions strictly for the sake of being able to retrieve every little mod or screw-up along the way to the next full rev.

SF
SF 2010-08-18

Yeah, we've gone down that road, too and you're right, it's a PITA....assuming you're diligent enough not to screw up the file structure or unintentionally change anything important.

KB
KB 2010-08-18

Scott,

I must say that I'm a bit horrified at the "deleting/rolling back" and checking back in comment.  Other than that, your example is exactly what + is for, you're just not using it as it should be.

You don't "check for typos" after a document has been checked in at a full rev, you do it before i.e. during the 1/2 rev (working copy) process.

In order to do this for Rev 001, you need to add an arbitrary revision for "new" documents at the beginning of your revision scheme.

e.g.

000 (new doc)

001

002

003

In the scheme above 000 is for "new" documents.

A user checks in a new doc at Rev 000.

Reviewer checks the doc, finds errors.

User corrects errors, checks in at Rev 000+

Reviewer checks the doc, still finds errors.

User corrects errors, again checks in at Rev 000+

Reviewer checks the doc, no errors.

User checks in at Rev 001

Done

I now have Rev 000 and Rev 001.  I do not care about Rev 000+

You just need to modify your approval and release process.

Does this help?

Note: If a document sees the outside world it should never be altered (deleted, corrected and then checked back in).

JH
JH 2010-08-18

Absolutely right Kenneth! Revision history serves as a good backup for back-tracking document intent. You cannot back-track if a prior version has been revised and over-written.

SF
SF 2010-08-18

Ken,

I sincerely apologize for horrifying you.  I must say, it warms my heart knowing that you have a system and people in place where mistakes and oversights NEVER happen. The reality for us is, while outputting 5 or 10 or 100 documents a day, things get missed.  Hopefully, they at least get caught BEFORE they reach the outside world.

In our scheme, a document is moving through the release process as (let's say) rev 001.  It gets reviewed by engineering at rev 001, gets reviewed by manufacturing at rev 001, gets reviewed my QA at rev 001.  According to your example, we then check and release it at rev 002???

While I will happily leave the revision/lifecycle scheme debates to the appropriate threads, I will use another example to get back to the original concern:

Let's say we have a document at rev 001.  Changes are made without the need for a secondary rev, so we make a working copy.

Document is now at 001+

More changes made, same circumstance...again 001+.

Now let's say we don't care to actually release this 001+.  So the next rev in play becomes 001A or 002 or 003A or whatever you like.

For whatever reason, at some point, it becomes necessary to go get the LATEST version of 001.  That version was in fact a working copy (001+).  Again, I'll say, if we did not want to see it in the vault, we would not have checked it in in the first place (as a working copy or otherwise).  Nor did we want to burn up yet more disk space by creating a secondary rev (or similar).

This gets me to the original question:  Why, if the vault allows me to check in a revision (in this case a working copy) will it not allow me to get it back later?  The folder structure in the vault was there to begin with, why not leave it.

KB
KB 2010-08-18

First errors do occur, just not very often.

That's what procedures and discipline can do for you.

"Let's say we have a document at rev 001.  Changes are made without the need for a secondary rev, so we make a working copy."

I'm totally baffled by this.  Please explain how changes are made without the need for a secondary (or primary) rev.

I still say you are missing the point of working copy.

The latest version of 001 is 001, not 001+.

Most users would see 001+ as being in an EC process and not ready for usage.

It's a temporary revision, perhaps SolidWorks could chime in and/or update the help file so users are aware.

Once again I will repeat a question I asked earlier ...

"Would you really send out a document for procurement with "Rev C+" in the title block?"

SF
SF 2010-08-19

Released documents never carry the working copy "moniker" (i.e. +).  We do not use the auto-numbering into the rev block, ever.  Therefore, working copy or not, the primary "portion" of the rev IS the rev.  Once we start to release a doc thru the system, it must retain it's rev, not go from say, 001+ to 002 or 002A, for example, at the point of release, as was earlier suggested.  A working copy seems the only way to do this.  Assemblies, drawings, references all recognize the latest revision as the working copy.  As far as we're concerned, the only rev that matters at time of release is the LATEST actual file before the lifecycle rules lock it up.  If it happens to be a working copy, so be it.

When it's time to do an ECN, the previous working copy rev becomes a moot point.  That is, until those rare occasions when we need to get back the LATEST released document.  In those instances when we want to roll back, we don't get the "latest" 001+, we get the version previous to that file, which is the only choice available.

This is the crux of the original question.  If every working copy overwrites the previous, why then is it not available as the LATEST version of the previous rev, once we go to a new primary or secondary rev?

Revision schemes, lifecycle usage and release processes are all a matter of professional needs and are not the issue here.  My question was simple...

If a file goes into the vault, there is nothing temporary about it and I should be able to get it.  Doesn't matter if I re-write over it 50 times.  If I wanted to save history of EACH little change, I would've used secondary revisions instead.  So why should this documented file be the ONLY instance where it simply "vanishes" from record as soon as it's taken to a new primary or secondary rev?

Please, no more responses about our processes or intent, as the company in question has been SUCCESSFULLY using PDMworks for a significant amount of time as has a plethora (that means a lot) of processes in place to hopefully avoid loopholes and pitfalls.  Had we foreseen this being an issue for these rare occasions, we would have adopted other means to achieve what we wanted to achieve.  Lesson learned.  Thanks for the comments, however my issue is still there...

Structure shows it...can't go get it [easily].  Why?

KB
KB 2010-08-19

The problem is in the way PDMW distributes the Revision.  You don't get the Revision until check in.  Other systems give the Revision before check in.

What you want is never going to happen with PDMW!

Either accept it or get a different pdm.

Implementing PDM to match your process is not always perfect (ooops, sorry about bringing up a sore subject).

With PDMW you're extremely limited as to customization.

Working Copy is what it is, temporary.  It is designed this way to go through the EC process.  You can't adjust PDMW but you can adjust your process.

You can talk about one thing and me another but, at the end of the day it works the way I described earlier.

Working Copy is a HALF REV, it is forward of the previous rev!

There is no way to automagically go backwards.

This is worth mentioning again, I previously discussed that we use ½ instead of the + for working copy indication. Another option would be to use .5 for working copy, this way it will be more obvious.  i.e. 001½ or 001.5

Once Rev 001 is checked in it is considered released (therotically). Otherwise use Rev 000+ until your ready to go with Rev 001.

DBWorks (from MechWorks) works the way you want, you get a rev "before" it is released not "after" it is checked in (like PDMW).  No need for working copy.  This is one answer to your problem.

I don't know how PDM Enterprise works.

TH
TH 2010-08-23

"Working revisions are not kept in the vault once you roll your revision to the next version. You can't rollback to a working copy, because they are not saved when the next revision supercedes it."

Actually, that is incorrect.  The files are saved, and they are not deleted from the vault when you roll to the next rev.  In the PDMW interface, you simply cannot get back to the working copy.

What bothers me about this, is that even though you cannot roll back to the working copy, and you cannot access it anymore, the file is still sitting there, uncompressed, taking up file space.  If the file is still sitting there, what purpose does that serve?  Either let us access it, or delete it.  If it remains as a backup means of history, then compress it.  This part of PDMW is half-baked.

TH
TH 2010-08-23

Scott,

I have to agree with Kenneth that the way you are using the working copy is incorrect, and does not match the intent of the software.  At one time, when I was setting up PDMW, I thought I wanted to do the same thing for the same reasons, but once I learned about this problem, I realized I had to change how I work with PDMW and use working copies.   Working copy is ONLY intended for what it says it is... a work in pogress.

To do what you want, you might have to turn on the option, "Allow latest revision overwrite".  Then, when you make minor edits such as spelling corrections, or adding reference geometry that doesn't affect the manufactured part, you can still access that rev after later revisions have been checked in.  Of course turning that option on has its own drawbacks, which I'm sure are obvious and don't need explaining here.

I do, however have to agree with you about being able to access the working copy revisions (intermediate revisions) after other revisions have been checked in.  That part seems half-baked (see my earlier post).

SM
SM 2010-08-23

Yes it is.

I was the one that did it in my last job and I had to be oh so careful, because as

it seems you already know, things can get screwed up so easily!!!

I hope you have a PDM manual to reference to.