Task Scheduler Enhancement Request List

I am creating this thread to combine enhancement requests forthe Task Scheduler. Please post your requests and I will add themto this post to keep it up to date.

1. General
- Add File dialog should allow selection of multiple files.
- Make it more obvious regarding when a task is going to start fortasks that are scheduled to start immediately (past start time).
- Make task scheduler truly run in the background. It takes thewindow focus and if you were typing it excecutes keyboardshortcuts.
- Increase speed. The current, start SolidWorks thread, open file,exectute macro, close file, close SolidWorks, rinse and repeatmethod is slow.
- Save lists of files for future use. (ex. Set of files needscustom properties modified then I need to print them all. Should beable to save list from 'update custom properties' and import itinto "print files'.)

2. Print Files
- When adding a file the files of type filter should default to'drawings'.

3. Update Custom Properties
- Remove the need to open each document in SolidWorks when addingor editing.
- If document has a custom property that is driven from the model(ex. length dim) then notify user that file needs to open inSolidWorks for updating.
SolidworksTask Scheduler
Comments 19
SF
SF 2008-10-10
My additional request would be:

1. Get rid of the extra characters added to file names.
TP
TP 2008-10-11
It would be nice to schedule the creation of PDF files forall drawings.
SF
SF 2008-10-22
Print settings expanded to include all standard windowsoptions. i.e shrink page to paper size. Maybe it already offersthis although I cant seem to find it.
SF
SF 2008-10-22
It has been a while since I have used the task schedule but Ihave never wanted to schedule the task for a later time.

I think it needs a START NOW button or start after the currentlyrunning task
BH
BH 2008-10-22
Be able to have multiple versions installed and actually workat the same time
SF
SF 2008-10-27
- Allow the exporting (or saving to file) of Task results(e.g. Update PDM files)
- Disable the automatic refresh (or at least be able to change thefrequency)
SF
SF 2008-11-26
1,To be able to shutdown Solidworks, when Solidworks locksup, when it is unable to update a file.

2, To keep the view if you expand to see what files are beingupdated, when it refreshes.

3, When updating or converting files, it should have the option tozoom and fit.

4, When updating or converting files, it should have the option toskip files or to set an order, as in built order for example,otherwise the main assembly can be rebuilt before the subassemblies.

5, Have a cancel task button that works.

6, Have printer options so that you can send files to differentprinters. Ie, send A3 prints to A3 printer, A1 to A1 printerect.... and automatically change rotation to suit the last printout, this must be already saved in the document, is it not?

7, If the part has textures, then realview to be turned onautomatically when printing documents. 2009 sp1.0, does not printtextures in drawings, UNLESS realview is turned on, beware!

I shall think of more
:-)
SF
SF 2008-11-26
More export options, I have a job I need to save 3D PDF filesof the parts and assemblies but there is no PDF file export optionfor parts and assemblies in SW Task Scheduler.
SF
SF 2008-11-26
To update/convert ALL configurations of a part orassembly
SF
SF 2009-01-15
Allow the task scheduler to run a specified macro on allselected files. In other words, for each file: open the file, runthe macro, close the file. The current "custom task" option onlyallows a single macro to be run, without allowing you to specifywhich files to run it on.
SF
SF 2009-02-09
1. To be able to modify weldment profiles (.sldlfp) customproperties.
2. Speed up the process (it takes much more time than to do itmanually)
SR
SR 2009-02-13
Perhaps this is a setting somewhere but it always wants tolog into the vault (PDM Works) for each file it opens. I can workaround it but removing my password temporarily but still veryannoying.

Secondly, a progress bar of some sort. When a task is scheduled, itappears to set there doing nothing for a long time. The bigger thetask the longer it takes to start.

Third, it's way too slow. For large tasks you may as well start itand then go do something else because it's going to beawhile.
WE
WE 2009-02-13
I think it was mentioned earlier... have the ability tofilter/edit the report generated when converting/updating oldfiles. It took 21 hours for it to 'convert' ~17000 files, thereport showed 17000 files completer successfully and a couplehundred with issues
SF
SF 2009-02-13
Would like to use task scheduler to export *.slddrw and *.dwgfiles to *.pdf.
Currenlty does NOT do *.dwg files.

Would like to look at PDF file in destination folder (if it exists)and compare time stamps - only export if PDF timestamp is earlierthan original file timestamp. This would allow for 'incremental'updating of all files in a folder and would reduce the time.
SF
SF 2009-03-18
I would like to see a program on the server that would updateall SW files without having to get file, open SW, convert file,save file, send file back and close SW. A program like areformatter. I have complained about the current process for yearsand nothing is being done to improve this. I take that back now SWdoes not close every time it will stay open for a period time theclose. But come on why is it nessacary to open every single file.When you have customer with thousands of files and increasing thisnumber every day and when upgrade SW every year they expect you togo through this pain every upgrade.

SF
SF 2009-05-02

Ryan Olson wrote:

 

Allow the task scheduler to run a specified macro on allselected files. In other words, for each file: open the file, runthe macro, close the file. The current "custom task" option onlyallows a single macro to be run, without allowing you to specifywhich files to run it on.

This would be ideal. If you could run any macro from TaskScheduler then you could save-as .pdf or .dwg with a macro.Although you should be able to do that anyways.

- Ian
SF
SF 2009-07-08
We took matters into our own hands regarding our earlierpost, "use task scheduler to export *.slddrw files to *.pdf"
I made a separate topic under the import/export area, as it seemedmost appropriate there.
https://forum.solidworks.com/forum/messageview.cfm?catid=12&threadid=22647


(We used an off-the-shelf PDF virtual printer software $75 and SEViewer API to handle the *.dwg files, but that's beyond the scopeof this SolidWorks forum.)
SF
SF 2009-07-09

Ryan Olson wrote:

 

Allow the task scheduler to run a specified macro on allselected files. In other words, for each file: open the file, runthe macro, close the file. The current "custom task" option onlyallows a single macro to be run, without allowing you to specifywhich files to run it on.

Second this one. I've always thought this was the mostobvious feature to include but for some reason has not found itsway in.
SF
SF 2011-01-25

Would like to have the choice to export drawings with hidden lines removed or shown.