MineSched 2022 Release Refresh 3
The release is now available for download from the 3DS Support site at www.3ds.com/support. GEOVIA maintained users covered under the Dassault Systèmes Support & Maintenance agreement can download this version at no cost.
GEOVIA MineSched 2022 Refresh 3 release has focused on providing enhancements to the existing functionalities and fixed issues raised in previous versions.
New capabilities have been added to the Dashboard Reporting process that are designed to improve the usability of the Reports, provide more visibility to the Haulage performance and reduce the requirements for post processing. There are also many other general improvements available through the continued efforts to perfect existing functionalities.
New Features in GEOVIA MineSched 2022 Refresh 3
New Haulage Reports available
In MineSched 2022 Refresh 3, a range of new Haulage related Dashboard reports are available. These include:
- Average Haulage Distance
- Average Truck Speed
- Average Tonnes/Load
- Average Truck Availability, Utilization and Efficiency.
These new reports provide Mine Planners with an improved ability to assess the overall effectiveness of their Haualge fleet for each Period of the Schedule.
New Cumulative Total columns can be created for Dashboard Reports
Cumulative totals are commonly used to chart the progress of a Schedule at each period of the Schedule, and this was additional work that would be required to be done in a Spreadsheet. Enabling these Cumulative total columns will save Mine Planners time when preparing reports. In addition to this, all dashboard reports now have Total values included at the bottom of the Dashboard Report.
For the full list of improvements, please refer to the release notes.
Watch the video going through the release highlights
Download the What's New Brochure
View the Release notes
View System Requirements