We have an enhancement in R2021x FD05 to create a dependency from engineering change to manufacturing change using Flowdown Dependency. In the video below, the engineering and manufacturing assemblies are modified using the stand-alone CA process and the new Flowdown Dependency mechanism.
Here is the R2021x FD05 CA ID card:
Video: Engineering to Manufacturing Change with Flowdown dependency
R2021x Tips_and_Tricks
