Hi, how Enovia / 3DExperience based PDM-PLM system would work with assemblies of 1000 - 20000 components and how performance compares to SW PDM Professional from engineer designers perspective?
We operate today with SolidWorks PDM Professional in few countries and two continents.
Other question; how is Cache managed and how large bunch of files can be locally stored in local SSD and kept Cloud synchronized? With this basically mean about loading times of new not before used / rarely used large assemblies. Do they load over the internet or are they saved locally as much as SSD allows
