Change Orchestration with Flowdown Dependency

The Approval of the Change Request CR enables Change Coordinators to define the Implementation strategy by orchestrating Change Orders CO and corresponding Change Actions CA with any dependencies between functional organizations.

The Flowdown Dependency is available within the ENOVIA Change Manager Role – CHG. The Flowdown Dependency creates a relation between Change Actions, which leads to a mapping between the Realized Changes of the “upstream” Change Action and the Proposed Changes of the “downstream” Change Action.

For example: The changes in the Design/Engineering of a product “upstream” leads to changes in the Manufacturing of it “downstream”. In this case, the Flowdown Dependency helps to propagate and manage the changes between the upstream domain that lead to other changes in the downstream one.

Please watch the video for the Flowdown Dependency: