During the CATIA Magic modeling activities, a number of requirements are captured and pushed in the 3DX platform (TRM). Later at detailed specification time, in CATIA Stimulus, functional requirements are developed, simulated and validated.
What is the workflow of the requirements during this end-to-end MBSE process? How can all the requirement end-up into TRM to be managed properly?
Watch this 4mn demo: